Skip to content
Concepts

Cards: 1 of 4. Quiz next, 3 to come.

The important work goes firstOne working day drawn as a band from the start of the day on the left to the end on the right. The first stretch holds three tall blocks numbered one to three, headed most important, and is fenced off from the rest by a solid line. Beyond the fence, many smaller blocks of email, chat, meetings and requests crowd together until the end of the day, with arrows showing them pressing against the fence. A note under the first stretch reads done before the inbox opens, and under the rest, competing for whatever is left.start of the dayend of the daymost important123done before theinbox openseverything reactiveemailchatmeetingrequestemailcompeting for whatever is left

A single working day drawn as a horizontal band from start to end. The first stretch holds three blocks numbered one to three, headed most important, and is fenced off from the rest. After it, smaller blocks of email, chat, meetings and requests crowd together until the end of the day, with arrows showing them pressing against the fence.

The important work goes first, before the day's messages get a vote.
The important work goes first, before the day's messages get a vote.

The important work goes first, before the day's messages get a vote.

Press the space bar to flip the card. Use the left and right arrow keys to move between cards, or swipe. Tab reaches the previous and next buttons.